Renovation for a

New Technology Center

Hauppauge, New York

The renovation of this existing 20,000 sf industrial concrete block and steel truss structure created many challenges to house an engineering and manufacturing facility producing ‘High Reliability and Space Qualified Modules’. The existing envelop was adapted architecturally and structurally to support the mechanical and electrical requirements needed for a new Class 100,000 Clean Room and other related manufacturing areas.
CHALLENGE

Conversion of an Industrial Building to a High Tech Engineering and Manufacturing Facility
SCOPE

Program Development
Class 100,000 Clean Room Facility
Engineering Offices and Production Related Areas
Roof Design and Dunnage to Support New Mechanical Rooftop Equipment
Electrical and Mechanical Support of technology based systems required for manufacturing