The renovation of this existing 20,000 sf industrial
concrete block and steel truss structure to house a milling metal machine
facility working with metals including Kovar and Invar required a new
floor slab. This included removal of the existing concrete slab before
providing a new concrete slab designed to support the weight of the
milling machinery and sufficiently damped to prevent vibration and deflection.
The existing envelop was adapted to support the mechanical, electrical
and venting requirements of the processes.
CHALLENGE
Conversion of an Industrial Building to a High
Tech Engineering and Manufacturing Facility
SCOPE
Program Development
Heavy Metal Machine Shop and Glass Sealing Room
Engineering Offices and Production Related Areas
New Concrete Slab
Electrical and Mechanical Systems to support this technology
|